Reflector Set for Nissan X-Trail: Mining Sites
This reflector set is the version most often ordered for mining sites on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Reflector Set |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Mining Sites |
| Base material | Powder Coated Steel |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Powder Coated Steel, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- License Plate Frame
- Work Lamp
- Dash Camera
- Bike Rack
- Car Fan
- Car Rice Cooker
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






