Cargo Net for Chery Tiggo: Rental Fleets
This cargo net is the version most often ordered for rental fleets on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Cargo Net |
|---|---|
| Vehicle application | Chery Tiggo |
| Intended use | Rental Fleets |
| Base material | Stainless Steel |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Stainless Steel, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Chery Tiggo without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- License Plate Frame
- Bike Rack
- Parking Lock
- Secondhand Vehicle Stock
- Tire Gauge
- Car Fan
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







