Bike Rack for Honda Accord: Coastal Delivery
This bike rack is the version most often ordered for coastal delivery on the Honda Accord. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Bike Rack |
|---|---|
| Vehicle application | Honda Accord |
| Intended use | Coastal Delivery |
| Base material | Bronze |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Bronze, chosen for the coastal delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Honda Accord without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Dash Camera
- Tow Rope
- Cargo Net
- Loading Ramp
- Trailer Hitch
- Reflector Set
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; coastal delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







