Adhesive Tape Roll for Fiat Strada: Rental Fleets
This adhesive tape roll is the version most often ordered for rental fleets on the Fiat Strada. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Adhesive Tape Roll |
|---|---|
| Vehicle application | Fiat Strada |
| Intended use | Rental Fleets |
| Base material | PU Leather |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — PU Leather, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Fiat Strada without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Air Freshener
- Tow Rope
- Container Securing Kit
- Floor Mat
- Cargo Carrier
- Car Charger
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







