Car Charger for Nissan X-Trail: Delivery Fleets
This car charger is the version most often ordered for delivery fleets on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Car Charger |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Delivery Fleets |
| Base material | Aluminium Alloy |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ISO 9001 |
Why this version
- Material — Aluminium Alloy, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Reflector Set
- Cargo Carrier
- Car Fan
- Tow Rope
- Car Refrigerator
- Jack Stand
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







