Air Freshener for Mercedes-Benz G-Class: Delivery Fleets
This air freshener is the version most often ordered for delivery fleets on the Mercedes-Benz G-Class. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Air Freshener |
|---|---|
| Vehicle application | Mercedes-Benz G-Class |
| Intended use | Delivery Fleets |
| Base material | Zinc Plated Steel |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Zinc Plated Steel, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mercedes-Benz G-Class without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Snow Chain
- Roof Box
- Car Charger
- Trim Clip Set
- Trailer Hitch
- Secondhand Vehicle Stock
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







