Welcome to Auto, Motorcycle Parts & Accessories official website!
Wheel Chock for Chery Tiggo: Airport Ground Fleets

Wheel Chock for Chery Tiggo: Airport Ground Fleets

Wheel Chock for Chery Tiggo: Airport Ground FleetsThis wheel chock is the version most often ordered for airport ground fleets on the Chery Tiggo. It is supplied to a written specification covering.

Contact Number:
Product Details

Wheel Chock for Chery Tiggo: Airport Ground Fleets

This wheel chock is the version most often ordered for airport ground fleets on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or a specification nobody had written down. Both come from a specification that was never written down.

Wheel Chock for Chery Tiggo

Specification

ProductWheel Chock
Vehicle applicationChery Tiggo
Intended useAirport Ground Fleets
Base materialPVC Coated Fabric
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceISO/TS 16949

Why this version

  • Material — PVC Coated Fabric, chosen for the airport ground fleets duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Chery Tiggo without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Wheel Chock in use

Related lines

  • Specialized Vehicle Kit
  • Jump Starter
  • Tricycle Parts Set
  • Car Antenna
  • Adhesive Tape Roll
  • Steering Cover

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; airport ground fleets is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top