Adhesive Tape Roll for Volkswagen Amarok: Security Patrols
This adhesive tape roll is the version most often ordered for security patrols on the Volkswagen Amarok. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Adhesive Tape Roll |
|---|---|
| Vehicle application | Volkswagen Amarok |
| Intended use | Security Patrols |
| Base material | PVC Coated Fabric |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — PVC Coated Fabric, chosen for the security patrols duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Volkswagen Amarok without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Car Organizer
- Roof Box
- Cable Tie Set
- Tricycle Axle
- Specialized Vehicle Kit
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; security patrols is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







