Roof Box for Fiat Strada: Rental Fleets
This roof box is the version most often ordered for rental fleets on the Fiat Strada. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Roof Box |
|---|---|
| Vehicle application | Fiat Strada |
| Intended use | Rental Fleets |
| Base material | Kevlar Composite |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Kevlar Composite, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Fiat Strada without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bus Parts Set
- Jump Starter
- Loading Ramp
- Tow Rope
- Car Refrigerator
- Cable Tie Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






