Car Fan for Toyota Land Cruiser: Mining Sites
This car fan is the version most often ordered for mining sites on the Toyota Land Cruiser. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or a specification nobody had written down. Both come from a specification that was never written down.

Specification
| Product | Car Fan |
|---|---|
| Vehicle application | Toyota Land Cruiser |
| Intended use | Mining Sites |
| Base material | Anodised Aluminium |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ISO 9001 |
Why this version
- Material — Anodised Aluminium, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Land Cruiser without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Wiper Blade Set
- Secondhand Vehicle Stock
- Jack Stand
- Cable Tie Set
- Jump Starter
- Trim Clip Set
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







