Car Refrigerator for Toyota Corolla: Passenger Transport
This car refrigerator is the version most often ordered for passenger transport on the Toyota Corolla. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Car Refrigerator |
|---|---|
| Vehicle application | Toyota Corolla |
| Intended use | Passenger Transport |
| Base material | Carbon Steel |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Carbon Steel, chosen for the passenger transport duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Corolla without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Rice Cooker
- Gas Station Nozzle
- Tyre Inflator
- Car Charger
- Wheel Cover
- Secondhand Vehicle Stock
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; passenger transport is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







