Bike Rack for Hyundai i20: Long-Distance Touring
This bike rack is the version most often ordered for long-distance touring on the Hyundai i20. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Bike Rack |
|---|---|
| Vehicle application | Hyundai i20 |
| Intended use | Long-Distance Touring |
| Base material | Neoprene |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Neoprene, chosen for the long-distance touring duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai i20 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Dash Camera
- Tow Rope
- Floor Mat
- Cable Tie Set
- Jack Stand
- Jump Starter
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; long-distance touring is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







