Car Antenna for Mazda CX-5: Mining Sites
This car antenna is the version most often ordered for mining sites on the Mazda CX-5. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Car Antenna |
|---|---|
| Vehicle application | Mazda CX-5 |
| Intended use | Mining Sites |
| Base material | Semi-Metallic Compound |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Semi-Metallic Compound, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mazda CX-5 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tricycle Cargo Box
- Roof Box
- Reflector Set
- Loading Ramp
- Jump Starter
- Wheel Cover
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







