Parking Barrier for Renault Duster: Track Days
This parking barrier is the version most often ordered for track days on the Renault Duster. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Parking Barrier |
|---|---|
| Vehicle application | Renault Duster |
| Intended use | Track Days |
| Base material | Ceramic Composite |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ISO 9001 |
Why this version
- Material — Ceramic Composite, chosen for the track days duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Renault Duster without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tricycle Parts Set
- Roof Box
- Tire Gauge
- Fuel Dispenser
- Tricycle Axle
- Car Refrigerator
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; track days is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







