Welcome to Auto, Motorcycle Parts & Accessories official website!
Work Lamp for Chevrolet Silverado: Rental Fleets

Work Lamp for Chevrolet Silverado: Rental Fleets

Work Lamp for Chevrolet Silverado: Rental FleetsThis work lamp is the version most often ordered for rental fleets on the Chevrolet Silverado. It is supplied to a written specification covering.

Contact Number:
Product Details

Work Lamp for Chevrolet Silverado: Rental Fleets

This work lamp is the version most often ordered for rental fleets on the Chevrolet Silverado. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: inconsistent hardness between lots, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Work Lamp for Chevrolet Silverado

Specification

ProductWork Lamp
Vehicle applicationChevrolet Silverado
Intended useRental Fleets
Base materialStainless Steel
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceECE R90

Why this version

  • Material — Stainless Steel, chosen for the rental fleets duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Chevrolet Silverado without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Work Lamp in use

Related lines

  • Floor Mat
  • Car Refrigerator
  • Wheel Chock
  • Valve Cap Set
  • Fuel Dispenser
  • License Plate Frame

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; rental fleets is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top