Utility Trailer Kit for Fiat Strada: Wet Weather Riding
This utility trailer kit is the version most often ordered for wet weather riding on the Fiat Strada. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Utility Trailer Kit |
|---|---|
| Vehicle application | Fiat Strada |
| Intended use | Wet Weather Riding |
| Base material | Cast Iron |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Cast Iron, chosen for the wet weather riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Fiat Strada without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Car Fan
- Bus Parts Set
- Jack Stand
- Car Charger
- Headlight Bulb Kit
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; wet weather riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






