Adhesive Tape Roll for Chery Tiggo: Track Days
This adhesive tape roll is the version most often ordered for track days on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Adhesive Tape Roll |
|---|---|
| Vehicle application | Chery Tiggo |
| Intended use | Track Days |
| Base material | Stainless Steel |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Stainless Steel, chosen for the track days duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Chery Tiggo without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Loading Ramp
- Phone Holder
- Specialized Vehicle Kit
- Car Rice Cooker
- Wheel Stop
- Wiper Blade Set
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; track days is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






