Floor Mat for Hyundai Santa Fe: Urban Courier Work
This floor mat is the version most often ordered for urban courier work on the Hyundai Santa Fe. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Floor Mat |
|---|---|
| Vehicle application | Hyundai Santa Fe |
| Intended use | Urban Courier Work |
| Base material | Magnesium Alloy |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Magnesium Alloy, chosen for the urban courier work duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai Santa Fe without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Work Lamp
- Tricycle Parts Set
- Wiper Blade Set
- Car Charger
- Car Organizer
- Steering Cover
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; urban courier work is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







