Wheel Stop for Renault Duster: Track Days
This wheel stop is the version most often ordered for track days on the Renault Duster. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Wheel Stop |
|---|---|
| Vehicle application | Renault Duster |
| Intended use | Track Days |
| Base material | Natural Rubber |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Natural Rubber, chosen for the track days duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Renault Duster without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Wiper Blade Set
- Trailer Hitch
- Fuel Dispenser
- Gas Station Nozzle
- Tyre Inflator
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; track days is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






