License Plate Frame for Mercedes-Benz Sprinter: Construction Sites
This license plate frame is the version most often ordered for construction sites on the Mercedes-Benz Sprinter. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | License Plate Frame |
|---|---|
| Vehicle application | Mercedes-Benz Sprinter |
| Intended use | Construction Sites |
| Base material | Aluminium Alloy |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — Aluminium Alloy, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mercedes-Benz Sprinter without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Work Lamp
- Tyre Inflator
- Trailer Hitch
- Headlight Bulb Kit
- Fuel Dispenser
- Car Rice Cooker
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






