Tow Rope for Kia Sportage: Mining Sites
This tow rope is the version most often ordered for mining sites on the Kia Sportage. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Tow Rope |
|---|---|
| Vehicle application | Kia Sportage |
| Intended use | Mining Sites |
| Base material | PVC Coated Fabric |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — PVC Coated Fabric, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Kia Sportage without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Fuse Kit
- Tire Gauge
- Work Lamp
- Adhesive Tape Roll
- Air Freshener
- Cable Tie Set
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







