Sun Shade for BMW 3 Series: Food Delivery
This sun shade is the version most often ordered for food delivery on the BMW 3 Series. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Sun Shade |
|---|---|
| Vehicle application | BMW 3 Series |
| Intended use | Food Delivery |
| Base material | Carbon Steel |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — Carbon Steel, chosen for the food delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the BMW 3 Series without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Headlight Bulb Kit
- Car Air Purifier
- Adhesive Tape Roll
- Tricycle Parts Set
- Parking Lock
- Loading Ramp
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; food delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







