Cargo Net for Volkswagen Amarok: Mountain Roads
This cargo net is the version most often ordered for mountain roads on the Volkswagen Amarok. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or a specification nobody had written down. Both come from a specification that was never written down.

Specification
| Product | Cargo Net |
|---|---|
| Vehicle application | Volkswagen Amarok |
| Intended use | Mountain Roads |
| Base material | EPDM Rubber |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — EPDM Rubber, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Volkswagen Amarok without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tow Rope
- Work Lamp
- Fuel Dispenser
- Air Freshener
- Car Refrigerator
- Utility Trailer Kit
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







