Car Charger for Chery Tiggo: Rural Transport
This car charger is the version most often ordered for rural transport on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Car Charger |
|---|---|
| Vehicle application | Chery Tiggo |
| Intended use | Rural Transport |
| Base material | Cast Iron |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ISO 9001 |
Why this version
- Material — Cast Iron, chosen for the rural transport duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Chery Tiggo without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Container Securing Kit
- Jump Starter
- Parking Barrier
- Gas Station Nozzle
- Steering Cover
- Phone Holder
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rural transport is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







