Fuel Dispenser for Kia Sorento: Heavy Load Hauling
This fuel dispenser is the version most often ordered for heavy load hauling on the Kia Sorento. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Fuel Dispenser |
|---|---|
| Vehicle application | Kia Sorento |
| Intended use | Heavy Load Hauling |
| Base material | Tempered Glass |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Tempered Glass, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Kia Sorento without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Container Securing Kit
- Car Vacuum Cleaner
- Loading Ramp
- Valve Cap Set
- Tyre Inflator
- Adhesive Tape Roll
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







