Tyre Inflator for Ford Focus: Airport Ground Fleets
This tyre inflator is the version most often ordered for airport ground fleets on the Ford Focus. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Tyre Inflator |
|---|---|
| Vehicle application | Ford Focus |
| Intended use | Airport Ground Fleets |
| Base material | PVC Coated Fabric |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — PVC Coated Fabric, chosen for the airport ground fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Ford Focus without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Trim Clip Set
- Fuel Dispenser
- Cargo Carrier
- Tow Rope
- Tyre Inflator
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; airport ground fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Ask for the current catalogue and the specification sheet for this line.






