Cable Tie Set for Haval H6: Food Delivery
This cable tie set is the version most often ordered for food delivery on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Cable Tie Set |
|---|---|
| Vehicle application | Haval H6 |
| Intended use | Food Delivery |
| Base material | Sintered Metal |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Sintered Metal, chosen for the food delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Haval H6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Wheel Chock
- Utility Trailer Kit
- Roof Box
- Seat Cover
- Specialized Vehicle Kit
- Car Fan
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; food delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







