Secondhand Vehicle Stock for Haval H6: Ride-Hailing Fleets
This secondhand vehicle stock is the version most often ordered for ride-hailing fleets on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Secondhand Vehicle Stock |
|---|---|
| Vehicle application | Haval H6 |
| Intended use | Ride-Hailing Fleets |
| Base material | ABS Plastic |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — ABS Plastic, chosen for the ride-hailing fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Haval H6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Car Organizer
- Fuse Kit
- Trailer Hitch
- Tricycle Parts Set
- Cargo Net
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; ride-hailing fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







