Welcome to Auto, Motorcycle Parts & Accessories official website!
Seat Cover for Chery Tiggo: Adventure Travel

Seat Cover for Chery Tiggo: Adventure Travel

Seat Cover for Chery Tiggo: Adventure TravelThis seat cover is the version most often ordered for adventure travel on the Chery Tiggo. It is supplied to a written specification covering material,.

Contact Number:
Product Details

Seat Cover for Chery Tiggo: Adventure Travel

This seat cover is the version most often ordered for adventure travel on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Seat Cover for Chery Tiggo

Specification

ProductSeat Cover
Vehicle applicationChery Tiggo
Intended useAdventure Travel
Base materialCast Iron
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceECE R90

Why this version

  • Material — Cast Iron, chosen for the adventure travel duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Chery Tiggo without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Seat Cover in use

Related lines

  • Trim Clip Set
  • Bus Parts Set
  • Fuse Kit
  • Adhesive Tape Roll
  • Cable Tie Set
  • Wheel Stop

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; adventure travel is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top