Work Lamp for Jeep Wrangler: Track Days
This work lamp is the version most often ordered for track days on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Work Lamp |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Track Days |
| Base material | Forged Aluminium |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — Forged Aluminium, chosen for the track days duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tire Gauge
- Valve Cap Set
- Headlight Bulb Kit
- Tyre Inflator
- Cable Tie Set
- Tricycle Cargo Box
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; track days is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







