Bus Parts Set for RAM 1500: Rental Fleets
This bus parts set is the version most often ordered for rental fleets on the RAM 1500. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Bus Parts Set |
|---|---|
| Vehicle application | RAM 1500 |
| Intended use | Rental Fleets |
| Base material | Forged Aluminium |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — Forged Aluminium, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the RAM 1500 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trailer Hitch
- Phone Holder
- Adhesive Tape Roll
- Wiper Blade Set
- Parking Lock
- Secondhand Vehicle Stock
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







