Car Charger for Toyota HiAce: Long-Distance Touring
This car charger is the version most often ordered for long-distance touring on the Toyota HiAce. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Car Charger |
|---|---|
| Vehicle application | Toyota HiAce |
| Intended use | Long-Distance Touring |
| Base material | Polypropylene |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Polypropylene, chosen for the long-distance touring duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota HiAce without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Container Securing Kit
- Steering Cover
- Car Fan
- Tricycle Parts Set
- Wiper Blade Set
- Car Antenna
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; long-distance touring is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







