Loading Ramp for MG ZS: Ride-Hailing Fleets
This loading ramp is the version most often ordered for ride-hailing fleets on the MG ZS. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Loading Ramp |
|---|---|
| Vehicle application | MG ZS |
| Intended use | Ride-Hailing Fleets |
| Base material | Neoprene |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — Neoprene, chosen for the ride-hailing fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the MG ZS without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Reflector Set
- Trailer Hitch
- Headlight Bulb Kit
- Air Freshener
- Car Charger
- Phone Holder
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; ride-hailing fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






