Trailer Hitch for Peugeot 3008: Ride-Hailing Fleets
This trailer hitch is the version most often ordered for ride-hailing fleets on the Peugeot 3008. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Trailer Hitch |
|---|---|
| Vehicle application | Peugeot 3008 |
| Intended use | Ride-Hailing Fleets |
| Base material | Aluminium Alloy |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Aluminium Alloy, chosen for the ride-hailing fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Peugeot 3008 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Headlight Bulb Kit
- Reflector Set
- Wheel Chock
- Wheel Cover
- Floor Mat
- Car Refrigerator
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; ride-hailing fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






