Gas Station Nozzle for RAM 1500: Off-Road Trails
This gas station nozzle is the version most often ordered for off-road trails on the RAM 1500. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Gas Station Nozzle |
|---|---|
| Vehicle application | RAM 1500 |
| Intended use | Off-Road Trails |
| Base material | Stainless Steel |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | DOT |
Why this version
- Material — Stainless Steel, chosen for the off-road trails duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the RAM 1500 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Roof Box
- Tyre Inflator
- Cargo Net
- Tricycle Cargo Box
- Parking Barrier
- Gas Station Nozzle
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; off-road trails is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







