Roof Box for Toyota Fortuner: Night Riding
This roof box is the version most often ordered for night riding on the Toyota Fortuner. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Roof Box |
|---|---|
| Vehicle application | Toyota Fortuner |
| Intended use | Night Riding |
| Base material | Kevlar Composite |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | E-mark |
Why this version
- Material — Kevlar Composite, chosen for the night riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Fortuner without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Organizer
- Roof Box
- Tire Gauge
- Tricycle Parts Set
- Adhesive Tape Roll
- Car Rice Cooker
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; night riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







