Headlight Bulb Kit for Toyota HiAce: Mountain Roads
This headlight bulb kit is the version most often ordered for mountain roads on the Toyota HiAce. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Headlight Bulb Kit |
|---|---|
| Vehicle application | Toyota HiAce |
| Intended use | Mountain Roads |
| Base material | Titanium Alloy |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Titanium Alloy, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota HiAce without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Floor Mat
- Wheel Cover
- Gas Station Nozzle
- Snow Chain
- Wiper Blade Set
- Car Charger
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






