Throttle Cable for Bajaj CT100: Lightweight Version
This throttle cable is built for the Bajaj CT100 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the lightweight version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Throttle Cable |
|---|---|
| Fitment | Bajaj CT100 |
| Version | Lightweight Version |
| Base material | Chromed Steel |
| Typical use | Food Delivery |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Chromed Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj CT100 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- rubber vulcanisation
- assembly line testing
- powder coating
- injection moulding
- laser cutting
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The lightweight version build is the one most often ordered for food delivery. Riders also fit it for rural transport, mining sites, urban courier work, farm use.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







