Inner Tube for Yamaha Ténéré 700: Budget Line
This inner tube is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Inner Tube |
|---|---|
| Fitment | Yamaha Ténéré 700 |
| Version | Budget Line |
| Base material | Chromed Steel |
| Typical use | Weekend Riding |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Chromed Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- anodising
- rubber vulcanisation
- ultrasonic cleaning
- robot welding
- sintering
- CNC machining
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The budget line build is the one most often ordered for weekend riding. Riders also fit it for daily commuting, track days, airport ground fleets, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







