Frame Slider for SYM Jet 14: Two-Piece Construction
This frame slider is built for the SYM Jet 14 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Frame Slider |
|---|---|
| Fitment | SYM Jet 14 |
| Version | Two-Piece Construction |
| Base material | Nylon 66 |
| Typical use | Rental Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Nylon 66 is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual SYM Jet 14 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- shot blasting
- anodising
- electroplating
- heat treatment
- ultrasonic cleaning
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The two-piece construction build is the one most often ordered for rental fleets. Riders also fit it for urban courier work, airport ground fleets, food delivery, daily commuting.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







