Rear Fender for Kawasaki Ninja 250: Upgraded Version
This rear fender is built for the Kawasaki Ninja 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Rear Fender |
|---|---|
| Fitment | Kawasaki Ninja 250 |
| Version | Upgraded Version |
| Base material | High Density Foam |
| Typical use | Ride-Hailing Fleets |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — High Density Foam is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki Ninja 250 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- shot blasting
- electroplating
- gravity casting
- injection moulding
- robot welding
- sintering
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The upgraded version build is the one most often ordered for ride-hailing fleets. Riders also fit it for food delivery, rural transport, urban courier work, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







