Roller Set for BMW R1250GS: High Performance
This roller set is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Roller Set |
|---|---|
| Fitment | BMW R1250GS |
| Version | High Performance |
| Base material | Anodised Aluminium |
| Typical use | Mining Sites |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — Anodised Aluminium is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual BMW R1250GS mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- die casting
- gravity casting
- assembly line testing
- sintering
- heat treatment
- anodising
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The high performance build is the one most often ordered for mining sites. Riders also fit it for rental fleets, ride-hailing fleets, off-road trails, delivery fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







