Front Fork for Dayun 150: Vented Design
This front fork is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Front Fork |
|---|---|
| Fitment | Dayun 150 |
| Version | Vented Design |
| Base material | Cast Iron |
| Typical use | Urban Courier Work |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — Cast Iron is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- electroplating
- sintering
- injection moulding
- assembly line testing
- laser cutting
- anodising
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The vented design build is the one most often ordered for urban courier work. Riders also fit it for construction sites, daily commuting, urban courier work, passenger transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







