Welcome to Auto, Motorcycle Parts & Accessories official website!
Front Fork for Dayun 150: Vented Design

Front Fork for Dayun 150: Vented Design

Front Fork for Dayun 150: Vented DesignThis front fork is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Front Fork for Dayun 150: Vented Design

This front fork is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Front Fork for Dayun 150

Specification

PartFront Fork
FitmentDayun 150
VersionVented Design
Base materialCast Iron
Typical useUrban Courier Work
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-45 days after approval
ComplianceDOT

What decides whether it lasts

  • Material — Cast Iron is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Front Fork production

Processes used on this line

  • electroplating
  • sintering
  • injection moulding
  • assembly line testing
  • laser cutting
  • anodising

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The vented design build is the one most often ordered for urban courier work. Riders also fit it for construction sites, daily commuting, urban courier work, passenger transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top