Choke Cable for Royal Enfield Bullet 350: Touring Version
This choke cable is built for the Royal Enfield Bullet 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the touring version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Choke Cable |
|---|---|
| Fitment | Royal Enfield Bullet 350 |
| Version | Touring Version |
| Base material | Cast Iron |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Cast Iron is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Bullet 350 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- surface grinding
- precision stamping
- cold forging
- electroplating
- gravity casting
- sintering
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The touring version build is the one most often ordered for weekend riding. Riders also fit it for construction sites, food delivery, rural transport, heavy load hauling.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







