Brake Cable for Benelli TNT 300: Sealed Unit
This brake cable is built for the Benelli TNT 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Brake Cable |
|---|---|
| Fitment | Benelli TNT 300 |
| Version | Sealed Unit |
| Base material | Bronze |
| Typical use | Heavy Load Hauling |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — Bronze is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Benelli TNT 300 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- anodising
- heat treatment
- rubber vulcanisation
- cold forging
- robot welding
- assembly line testing
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The sealed unit build is the one most often ordered for heavy load hauling. Riders also fit it for wet weather riding, urban courier work, adventure travel, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







