Brake Pad for TVS Sport: Long Life Version
This brake pad is built for the TVS Sport and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the long life version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Brake Pad |
|---|---|
| Fitment | TVS Sport |
| Version | Long Life Version |
| Base material | Cast Iron |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Cast Iron is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Sport mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- gravity casting
- electroplating
- CNC machining
- die casting
- assembly line testing
- shot blasting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The long life version build is the one most often ordered for weekend riding. Riders also fit it for urban courier work, weekend riding, ride-hailing fleets, mining sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







