Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Damper for Kawasaki Z900: Folding Type

Steering Damper for Kawasaki Z900: Folding Type

Steering Damper for Kawasaki Z900: Folding TypeThis steering damper is built for the Kawasaki Z900 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Steering Damper for Kawasaki Z900: Folding Type

This steering damper is built for the Kawasaki Z900 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: packing that arrived crushed at the port, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Steering Damper for Kawasaki Z900

Specification

PartSteering Damper
FitmentKawasaki Z900
VersionFolding Type
Base materialCast Iron
Typical useCoastal Delivery
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Cast Iron is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Kawasaki Z900 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Steering Damper production

Processes used on this line

  • die casting
  • shot blasting
  • anodising
  • robot welding
  • precision stamping
  • cold forging

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The folding type build is the one most often ordered for coastal delivery. Riders also fit it for security patrols, construction sites, rural transport, farm use.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top