Welcome to Auto, Motorcycle Parts & Accessories official website!
Tachometer for Haojue 125: High Performance

Tachometer for Haojue 125: High Performance

Tachometer for Haojue 125: High PerformanceThis tachometer is built for the Haojue 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Tachometer for Haojue 125: High Performance

This tachometer is built for the Haojue 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Tachometer for Haojue 125

Specification

PartTachometer
FitmentHaojue 125
VersionHigh Performance
Base materialCarbon Steel
Typical usePassenger Transport
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time25-35 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Carbon Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Haojue 125 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Tachometer production

Processes used on this line

  • sintering
  • robot welding
  • shot blasting
  • anodising
  • CNC machining
  • gravity casting

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The high performance build is the one most often ordered for passenger transport. Riders also fit it for motocross, rural transport, off-road trails, farm use.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top