Welcome to Auto, Motorcycle Parts & Accessories official website!
Top Box for Loncin 150: High Performance

Top Box for Loncin 150: High Performance

Top Box for Loncin 150: High PerformanceThis top box is built for the Loncin 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Top Box for Loncin 150: High Performance

This top box is built for the Loncin 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Top Box for Loncin 150

Specification

PartTop Box
FitmentLoncin 150
VersionHigh Performance
Base materialTempered Glass
Typical useDaily Commuting
MOQ500 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceRoHS

What decides whether it lasts

  • Material — Tempered Glass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Loncin 150 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Top Box production

Processes used on this line

  • rubber vulcanisation
  • heat treatment
  • die casting
  • CNC machining
  • injection moulding
  • shot blasting

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The high performance build is the one most often ordered for daily commuting. Riders also fit it for passenger transport, mountain roads, urban courier work, adventure travel.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top