Tank Bag for Honda CB125F: Long Life Version
This tank bag is built for the Honda CB125F and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the long life version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Tank Bag |
|---|---|
| Fitment | Honda CB125F |
| Version | Long Life Version |
| Base material | Carbon Fibre Composite |
| Typical use | Delivery Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Carbon Fibre Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda CB125F mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- robot welding
- gravity casting
- anodising
- injection moulding
- laser cutting
- rubber vulcanisation
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The long life version build is the one most often ordered for delivery fleets. Riders also fit it for security patrols, adventure travel, coastal delivery, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







